The leaves have fallen and the mercury has dropped and we're FINALLY progressing the fit out of the brand new FW offices apace. This is thanks entirely to the awesome design and construction team who laugh in the face of exhaustion and start work at 5am in order to get a good crack of the whip.

The Cornish contingent of Ross and Jon have been pushing hard through the last week and as a result we have the makings of a kitchen and bathroom. At the same time the London team of Jen, Liam and Viking are pushing ahead with everything from plastering to covering the ceiling with Mega Boner.

Here's a view of the downstairs space. In the middle will be the bathroom whilst the kitchen will be to the right.

Here's a view of the downstairs space. In the middle will be the bathroom whilst the kitchen will be to the right.

Bona Mega applied to the ceiling brings out the colour of the wood used for the shuttering to cast the concrete.

Bona Mega applied to the ceiling brings out the colour of the wood used for the shuttering to cast the concrete.

We're pleased with the way the first floor is shaping up. The stark concrete pillars contrast with the complex organic tones of the ceiling, don't you know. The hole in the floor is filled although this will be partly removed again when the glass floor arrives.

Now that the Tornado drop tank hanging in reception idea has been shelved. We've started thinking about a jet engine cowling as a reception desk. We'd cut away around 1/4 of it giving space to walk inside. What do you think?

Cornish contingent of the build team - Job's a good'un.  

Cornish contingent of the build team - Job's a good'un.